The project is funded and a timeline for KOSH is penciled in.
We will build a flying fuselage, bulkheads, longerons, firewall, spars, instrument panel, and landing gear system. We have a head start on most of this. Molds are made. The spar will have to be sized for the new airfoil so we will prob use the GA 37A315 @ the root and to the gear attach point.
2 degree dihedral and 2 degree twist.
I have all the hardware for two aircraft.
Goal is EOW 550#-580#
7g spar
Infused carbon fiber
Monocoque
130hp engine
Always looking for input. Scale is locked
We will build a flying fuselage, bulkheads, longerons, firewall, spars, instrument panel, and landing gear system. We have a head start on most of this. Molds are made. The spar will have to be sized for the new airfoil so we will prob use the GA 37A315 @ the root and to the gear attach point.
2 degree dihedral and 2 degree twist.
I have all the hardware for two aircraft.
Goal is EOW 550#-580#
7g spar
Infused carbon fiber
Monocoque
130hp engine
Always looking for input. Scale is locked