Trackwelder
Member
I was encouraged to start a builders log by someone who is really influencing my build, I have not had the chance to meet him but have taken advantage of the Builders Log that he has put on another site. I am not real good at documenting what I have done, but have taken pictures as I build. My workshop for now is in my house normally in the basement so for now I can only build as big of a piece as will fit out the door. My hangar has no electricity and a dirt floor so it will be a while before it is put there. I don't have a garage (that is another project for this summer)
I started this project in late november of 2013 My order from Aircraft Spruce for wood took over 2 months to get to me, as I had decided to build the wings first figuring I could get them through the door easier. If I can figure out this site I will post the pictures I have taken so far, and will attempt to keep an ongoing dialog and pictures as I build.
I started this project in late november of 2013 My order from Aircraft Spruce for wood took over 2 months to get to me, as I had decided to build the wings first figuring I could get them through the door easier. If I can figure out this site I will post the pictures I have taken so far, and will attempt to keep an ongoing dialog and pictures as I build.